Transformer Test Power Supply
Select a controlled AC power source for transformer partial discharge, induced-voltage, no-load loss, load and temperature-rise testing.
Different transformer tests place different requirements on the power source, including voltage, frequency, capacity and partial-discharge background where applicable. SDACME configures transformer test power supplies according to the test method and the transformer under test.
The test method determines which power-source characteristics should be prioritized.
What Is a Transformer Test Power Supply?
A transformer test power supply is the controlled AC power source used to provide the voltage, frequency and power required for a specific transformer test.
The required source depends on the test method. Partial-discharge testing places particular emphasis on the electrical background of the test arrangement, while induced-voltage testing requires controlled variable-frequency excitation. No-load loss, load and temperature-rise tests require the test power source to be configured according to the transformer and the applicable test conditions.
Choose a Power Source by Transformer Test
Start with the transformer test you need to perform. Each test places different requirements on the AC power source, so the appropriate configuration should be selected around the test method rather than by a single power rating alone.
Partial Discharge / IVPD
Low electrical background, stable output and test conditions suitable for partial-discharge measurement.
Transformer Partial Discharge Test →Induced Voltage / DVDF / ACLD
Controlled voltage with adjustable frequency for transformer induced withstand testing.
Transformer Induced Voltage Test →PD-Free Variable-Frequency Power Source
A variable-frequency AC source configured for transformer tests where low partial-discharge background is required.
Partial Discharge-Free Power Supply →No-Load & Load Testing
Test power configured according to the transformer and the applicable no-load or load test requirements.
See Transformer Factory Tests ↓Temperature-Rise Testing
Transformer test power configured according to the required temperature-rise test arrangement and project conditions.
Covered on This Hub PagePower Source for Partial Discharge and IVPD Testing
Partial-discharge testing requires a test power source selected with particular attention to the electrical background of the complete test arrangement, as well as the required voltage, frequency and transformer test conditions.
Define the PD test conditions first
Transformer Partial Discharge Test
See the dedicated application page for transformer PD / IVPD test requirements, test arrangement and power-source considerations.
Explore PD Testing →Power Source for Induced Voltage, DVDF and ACLD Tests
Transformer induced-voltage testing requires controlled AC excitation. A variable-frequency power source allows the output conditions to be configured according to the transformer and the applicable induced withstand test requirement.
Required Test Voltage
Define the electrical test voltage required for the transformer under test.
Adjustable Frequency
Select the frequency required by the induced-voltage test procedure.
Power-Source Capacity
Configure the source around the transformer and the required test conditions.
Need the induced-voltage test application guide?
Continue to the dedicated DVDF / ACLD / transformer induced-voltage page.
When Is a PD-Free Variable-Frequency Power Supply Required?
Not every transformer test requires the same partial-discharge background performance. For PD-sensitive tests, a partial discharge-free variable-frequency source can be selected when a low-background AC test source is required.
Power Sources for Other Transformer Factory Tests
In addition to partial-discharge and induced-voltage applications, transformer test power can also be configured for no-load loss, load and temperature-rise testing.
No-Load Loss Test
Test power can be configured for transformer no-load loss testing according to the transformer and the required test conditions.
Load Test
Test power can be configured for transformer load testing according to the transformer and project test requirements.
Temperature-Rise Test
Test power can also be configured for transformer temperature-rise testing according to the required test arrangement.
How to Select a Transformer Test Power Supply
Start with the transformer and the test requirement. The following information gives SDACME the basis for an initial power-source review.
Reference Configuration Range
The variable-frequency power platform covers a broad reference range for transformer testing. Final configuration is selected according to the transformer, test method and project requirements.
Transformer Test Power Supply Project References
Transformer test-station requirements vary by project. Existing project references demonstrate different capacity levels used in transformer testing applications.
Project reference for a partial discharge-free variable-frequency power source used in a transformer test-station application.
High-power transformer testing reference based on an existing project configuration.
Existing project records include 1500 kVA configurations associated with both 110 kV-class and 220 kV-class transformer test stations.
Project reference demonstrating a higher-capacity transformer test power-source configuration.
Transformer Test Power Supply FAQ
Key questions when selecting a power source for transformer testing.
What is a transformer test power supply?
What power source is used for transformer partial discharge testing?
Why is variable frequency used for transformer induced-voltage testing?
Do all transformer tests require a PD-free power supply?
Can one power platform support different transformer tests?
How is transformer test power-supply capacity selected?
Is a transformer test power supply the same as a complete transformer test system?
Configure the Power Source Around Your Transformer Test
Tell us what transformer you need to test and which test you need to perform. SDACME can review the available electrical requirements and recommend an appropriate transformer test power-source configuration.